Construction
Construction of the Supply Station and Locomotive Inspection Centre Area in Campos, Col. (1st Phase 2002)
- Improvement and preparation of land.
- Construction of provisional electrical sub-station.
- Construction of perimeter fence.
Construction of the Supply Station and Locomotive Inspection Centre Area in Campos, Col. (2nd Phase 2003)
Total execution of the Executive Project for the construction of the Supply Station and Locomotive Inspection Centre Area in Campos, Col., carrying it out in accordance with the programmes of the civil, mechanical, electrical works and also the automization and control works; projected in agreement with valid regulations, including the supply and installations of the equipment and accessories necessary to the total functioning of the Supply Station Area, delivering it to the user area of Ferromex in even operation.
Construction of the access route to the installations of the Supply Station Area (outline, improvement of the land and paving).
Execution of the corresponding jobs for the adaptation of the Supply Station and Locomotive Inspection Centre Area in Sufragio, Sin.
Total execution of the adaptation project for the Supply Station and Locomotive Inspection Centre Area in Sufragio, Sin. Carrying it out in accordance with the programmes of the civil, mechanical and electrical works projected in agreement with the valid regulation, including the supply and installations of the equipment and accessories necessary to the total functioning of the Supply Station Area, delivering it to the user area of Ferromex in even operation.
Ferrocarril Mexicano S.A. de C.V.
Guadalajara, Jal.
- Round House
- Installation of the compressed air network and the electrical installation in the carriage workshop.
- Rehabilitation of the Recipient Sub-station and circuits 1 and 2 at medium pressure.
- Supply Station and Locomotive Inspection Centre Area.
- Adaptation of the Supply Station and Locomotive Inspection Centre Area in Guadalajara, Jal. 1st and 2nd stages.
Various
- Construction of Mexpasa workshop.
- Supply and up close installation, with cyclonic mesh, of the freight terminal specialized in Guadalajara, Jal.
- Various jobs for the adaptation of offices in the customs area (intermodal).
- Construction of 3 sub-stations of medium pressure with the connections corresponding to the automotive terminal of Guadalajara.
Nogales, Son.
Grupo Urrea S.A. de C.V.
- Transfer of Chrome Plant located in Denver, Colorado in the U.S.A to the city of Guadalajara, then to the plant in el Salto, Jal.
- Assembly and Installation of the polishing equipment in VALUR II plant in el Salto (Mapos, L8 and L4, and Acme 006 machines).
- Assembly and Installation of Systems for the Collection of Fumes and Dust in the VALUR plants of Guadalajara and el Salto.
Assembly and Installation of Systems for the Collection of Oven Fumes for the BRONCES URREA SA DE CV plants.
- Re-accommodation of Plant (Lathes, Industrial Stampers, Presses, Bar Feeders y Automatic Threaders)
- General Electrical Re-installation of BT and AT in the URREA HERMANOS Plant, due to the explosion of 22nd April 1993.
- Electromechanical assembly of the BAMESA plant in the Industrial Corridor of el Salto Considering the Sub-station, Structures and Assembly of Equipment, therefore putting it into action.
- Fitting and Installing Service lines for the Chrome Plant on the UDISA ship (Electrical, Water, Vapour, Condensation and De-mineralized Water)
- Electromechanical assembly of the URREA DESIGN plant, including modifications in the sub-station and General lines.
- Re-localizing the Extrusion and gyrating Ovens equipment from the UDISA plant to the BAMESA plant.
- Fabrication of the sub-station of 23 kv at 440-220 volts of 2000 Kva. In the open air, for the BAMESA plant.
- Manual installation of Rectificators in Chrome.
- Modification of the Piping for Deep Water Pumps in URREA II.
- Rehabilitation of Equipment for the Handling of Sand.
- Assembly and Installation of the Container for Rack Ovens.
- Design, Fabrication and Assembly of an Open-air Style Sub-station of 1500 Kva. in the BAMESA Plant.
- Electro-mechanical Re-conditioning for the VALUR Plant, Guadalajara.
- Electro-mechanical Re-conditioning for the DICA Plant, El Salto.
- Re-location of the Machinery Department and Independisation of Piping Parts in the VALUR Plant Guadalajara.
- Fabrication of 2 Storage Tanks for Combustibles with the Capacity of 10,000 Lts. For the ACABADOS URREA Plant, El Salto, Jal.
- Electromechanical Assembly of 2 Automatic Polishing Machines on the VALUR and DICA Plant, El Salto, Jalisco
Arancia Corn Products S.A. de C.V.
- Fabrication of a Tank for the Regulation of water pH for the plant processes with A-285 Carbon Steel Plates with a Capacity of 1100 mts,³ Hygienically Finished. Assembly in the Field.
- Mounting of 136 pieces of equipment from 0.5 to 15 tones of weight on 4 different levels from 0 to 26m height, levelling them and installing piping for service and processing, lines and stainless valves and A° Carbon from ½” to 12”. (Project Maltés III).
- Various jobs in the area of projects and maintenance, such as reconstruction of platform piping and assembly of equipment.
- Assembly of equipment for Project FENIX.
.
Celulosa y Derivados S.A. de C.V.
- Fit out and Install Condensed Return Lines for Turbo Tow Press and Condensed Head Press.
- Installation of a System that Measures lack of salt and of a Sulphuric Acid Equalizer by Biological Guidelines.
- Assembly of Cooling Tower and Pumping equipment, in order to fit out the Alim-Ret lines for Services, Piping and Zulza Pumps.
- Various jobs of Modification and Electric Maintenance of Sub-stations and CCMS Plant.
- Adaptation of Piping and Pump Equipment for treated water in Physical Processes (Machines 7, 8 and 10) and Recuperation of D.M.F.
- Main Racks for Piping of Concentrated Foam System to AN, AV tanks.
- Replacement of Ducts for the Air Conditioning System of Luwas 1 and 2 of the Thermal sectioned Department.
- Withdrawal of Plates and Installation of Mellalack Column Sealing of D.M.A. in the Distillation Department.
- Inspection and Internal Reparation of Dehydrating Distillation Column No.2.
- Re-location of Machine 5.
- Platforms in Chimney for Monitoring Stations.
- Installation of QDOTS in the boilers’ area.
- Substitution and Fabrication of tank for exhausted suspension products.
- Fabrication of a Tank for Exhausted Suspension products in Stainless Steel with a Capacity of 20 mts³ for CYDSA, El Salto, Jal.
- Foam System in Tank of 90mts³ of DMF of Distillation for CYDSA, El Salto, Jal.
- Extension of Operation Platform in Boiler Machine 9, for CYDSA, El Salto, Jal.
Compañía Siderúrgica de Guadalajara S.A. de C.V.
- Installation of Feeding and Return Line for Cooling Water in the Continuous Washing of Steel Plant II.
- Modify the plating of the conveyor belts, in Lamination II.
Constructora Bugambilias S.A. de C.V.
- Re-conditioning of Pump of 100 and 150 hp
- Installation of Watering Pumps in the Gardens of the Bugambilias Housing Estate, and also the assembly of a Sub-station for the pumps.
- Fabrication of junction-box for Telephone Connections.
Envases de Jalisco S.A. de C.V.
- Assembly of 36” and 18” Duct for the transportation of SCRAP lids.
- Electrical Installation of Ventilators of 75, 30 and 10 hp.
- Fabrication and Assembly of Platform for the transportation of spray paint.
Petróleos Mexicanos
- The fitting out, Reparation and Activation of 9 transportable Cranes on the Cactus Petrochemical Complex in Reforma, Chiapas.
- Contract No. CPQC-CTS-025/91 For the Reparation of the Lock-gate and Globe Valve of 150, 300 and 600 pounds the C.PQ. CACTUS.
- Various jobs in the Testing and Starting of Storage and Distribution Plants in el Castillo, Jalisco.
- Fabrication of DIESEL Storage Tank with a capacity of 20,000 barrels for PEMEX, Storage Sub-station of el Castillo, El Salto, JAL.
Residencial Villas Del Sol (Pátzcuaro, Michoacán)
- Project and execution of the job of Electrifying and Lighting the Villas del Sol Residence, Pátzcuaro, Michoacán.
Tabacos Azteca S.A. de C.V. (Tepic, Nayarit)
- Elaboration of basic and detail engineering of the development of the re-localization Project and the use of the equipment for TABACOS MEXICANOS y EXTAMEX plant, forming a new productive company dominated by PROTAMEX.
Plásticos Rex (Poncitlán, Jal.)
- Assembly and installation of Moulding Plant.
- Project, Installation and Assembly of Resins Mill.
Trabajos Realizados En Diferentes Plantas
- Re-localization of Reactor Electrical Lines on NUODEX Plant.
|